Loading...

Chrome plating fumes purification

Hard chrome plating unit fume extraction and treatment system. The treatment takes place in two sequences: in the first phase the polluted air passes through a condensate separator; in the second phase, the washing takes place in a static packed bed.

Dimensions

Bed built entirely in PVC with a ø of 1,800 mm

Air flow

13.000 m3/h

Request more information

"*" indicates required fields

Address*