Loading...

Chromic acid fume treatment

Hard chrome plating unit fume extraction and treatment system.

Treatment takes place in two steps:

  • the first phase in a condensate separator
  • the second phase by washing in a packed static bed

Dimensions

Bed built entirely in PVC with a diameter of 1,800 mm

Air flow

15.000 m3/h

Request more information

"*" indicates required fields

Address*